-- card: 36988 from stack: in -- bmap block id: 37223 -- flags: 0000 -- background id: 3633 -- name: Lag Times 2 -- part 34 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 35 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=81 top=221 right=247 bottom=156 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: -- part 37 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=310 top=117 right=143 bottom=389 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: -- part contents for background part 6 ----- text ----- For example, a cannery could use start-to-start lag time to indicate that the canning process can begin three days after its crews start picking tomatoes. Or a contractor could use finish-to-start lag time to show that the carpenters can’t go into a house to install baseboards until the varnish on the floors has had three days to dry. -- part contents for background part 7 ----- text ----- Lag time is displayed as a number on the dependency line connecting two tasks. The number represents the units of lag time between the tasks. If the lag is start-to-start, the number is followed by an asterisk (*). -- part contents for background part 27 ----- text ----- Outline of a Project -- part contents for background part 28 ----- text ----- Lag Times -- part contents for card part 34 ----- text ----- 2 of 2 -- part contents for card part 35 ----- text ----- Start-to-start lag time -- part contents for card part 37 ----- text ----- Finish-to-start lag time